Silver Standard And Golden Arrow Resources joint venture

Silver Standard Resources Inc. announces it has provided Golden Arrow Resources Corporation  with the required notice to exercise its option on the Ch …

Silver Standard And Golden Arrow Resources joint venture

© 2020 www.B-TV.com. All Rights Reserved.

Silver Standard Resources Inc. announces it has provided Golden Arrow Resources Corporation with the required notice to exercise its option on the Chinchillas project and form a joint venture with Golden Arrow for the development of the property.The joint venture will be comprised of Silver Standard's Pirquitas property and Golden Arrow's Chinchillas property and will be owned on a 75%/25% basis by each company, respectively. Silver Standard will be the operator.

Production work committee

Golden Arrow Resources Corporation (TSX-V: GRG, FSE: GAC, OTCQB: GARWF), “Golden Arrow” or the “Company”) is pleased to announce that it is establishing a production work committee. Which will include the very experienced mining engineer Mr. Alf Hills. Who will monitor the production procedure to comply with the joint venture agreement conditions, corporate management responsibilities and governance.Initially, Mr. Hills will be an advising consultant to Golden Arrow. He will then be appointed to represent Golden Arrow on the board of the recently announced joint venture company. That will be structured to hold Golden Arrow’s Chinchillas project and the Pirquitas mining and processing facilities of Silver Standard Resources Inc. (NASDAQ: SSRI) (TSX: SSO) (“Silver Standard”), both of which are located in Jujuy Province in the north of Argentina. Upon closing, expected on or before May 31, 2017, the joint venture will hold Chinchillas and Pirquitas owned 75/25 by Silver Standard and Golden Arrow.

About the team

Alf Hills has over 35 years of international mine evaluation, development and operational experience. From 2006 to 2013, he was the CEO and a director of Kobex Minerals Inc. and its predecessor company, International Barytex Resources.Prior to that he spent 26 years with the Placer Dome group. He was involved in development of the CIM Best Practice Guidelines for Mineral Resource and Mineral Reserve Estimates. Mr. Hills is registered as a Professional Engineer and is a graduate of the University of British Columbia in Mining and Mineral Process Engineering.On the exploration side, Brian McEwen will continue his role as the VP of Exploration and Development with his focus being the elaborate and advanced property portfolio that remains 100% owned by Golden Arrow to discover a potential fourth new discovery.Nikolaos Cacos will be VP of Corporate Development and budgeting for compliance and governance in respect of the JV partnership and GRG responsibilities.In commenting on this latest development the CEO of Golden Arrow, Joseph Grosso noted: “With a relatively short timeline to the pooling of assets as proposed by the joint venture we are very pleased to have put in place a veteran mining engineer to represent our interests as this moves forward and as Chinchillas goes into development mode”.

No items found.

You might also like

Copper Giant: Could a 1.6-Billion-Tonne Copper Deposit Help Address the Global Supply Gap?
Metals & Mining
October 26, 2026

Copper Giant: Could a 1.6-Billion-Tonne Copper Deposit Help Address the Global Supply Gap?

Copper Giant is advancing the Mocoa Copper-Molybdenum Project in Colombia, a near-surface deposit that has grown well past the billion-tonne mark: 1.6 billion tonnes of Inferred and 290 million tonnes of Indicated mineral resources, holding 9.36 billion and 2.13 billion pounds of copper. Contained copper is up 50% in a year, and the company is working toward its first Preliminary Economic Assessment.

This is some text inside of a div block.
Arizona Eagle Mining: Can Two New Gold Discoveries Unlock a Historic High-Grade Mine?
Metals & Mining
October 26, 2026

Arizona Eagle Mining: Can Two New Gold Discoveries Unlock a Historic High-Grade Mine?

Arizona Eagle Mining is advancing the past-producing McCabe Gold-Silver Mine in Arizona, where two discoveries from its first seven drill holes are opening new exploration opportunities at a historic high-grade operation.

This is some text inside of a div block.
Heliostar Metals: Can High-Grade Gold Mines Fuel Growth to 500,000 Ounces Annually?
Metals & Mining
October 26, 2026

Heliostar Metals: Can High-Grade Gold Mines Fuel Growth to 500,000 Ounces Annually?

Heliostar Metals is building the next 500,000 oz/yr mid-tier gold company, combining cash flow from two operating mines with a deep pipeline of development growth projects starting with the high grade Ana Paula mine next year.

This is some text inside of a div block.
Subscribe and receive the investor Info